<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE ArticleSet PUBLIC "-//NLM//DTD PubMed 2.7//EN" "https://dtd.nlm.nih.gov/ncbi/pubmed/in/PubMed.dtd">
<ArticleSet>
<Article>
<Journal>
				<PublisherName>Shahid Beheshti University</PublisherName>
				<JournalTitle>International Journal of Research and Technology in Electrical Industry</JournalTitle>
				<Issn>2821-0190</Issn>
				<Volume>3</Volume>
				<Issue>1</Issue>
				<PubDate PubStatus="epublish">
					<Year>2024</Year>
					<Month>05</Month>
					<Day>20</Day>
				</PubDate>
			</Journal>
<ArticleTitle>Modeling Time-Delay in Consensus Control: A Review</ArticleTitle>
<VernacularTitle></VernacularTitle>
			<FirstPage>287</FirstPage>
			<LastPage>298</LastPage>
			<ELocationID EIdType="pii">104708</ELocationID>
			
<ELocationID EIdType="doi">10.48308/ijrtei.2024.234427.1037</ELocationID>
			
			<Language>EN</Language>
<AuthorList>
<Author>
					<FirstName>Samaneh</FirstName>
					<LastName>Behjat</LastName>
<Affiliation>Department of Electrical Engineering, Marvdasht Branch, Islamic Azad University, Marvdasht, Iran</Affiliation>

</Author>
<Author>
					<FirstName>Mohammad Reza</FirstName>
					<LastName>Salehizadeh</LastName>
<Affiliation>Department of Electrical Engineering, Marvdasht Branch, Islamic Azad University, Marvdasht, Iran</Affiliation>
<Identifier Source="ORCID">0000-0002-1708-6862</Identifier>

</Author>
<Author>
					<FirstName>Giulio</FirstName>
					<LastName>Lorenzini</LastName>
<Affiliation>Dipartimento di Ingegneria e Architettura, Universita’ di Parma, Parco Area delle Scienze 181/A, 43124 Parma, Italy</Affiliation>
<Identifier Source="ORCID">0000-0002-5676-8575</Identifier>

</Author>
</AuthorList>
				<PublicationType>Journal Article</PublicationType>
			<History>
				<PubDate PubStatus="received">
					<Year>2024</Year>
					<Month>01</Month>
					<Day>20</Day>
				</PubDate>
			</History>
		<Abstract>A multi-agent system (MAS) consists of spatially distributed agents that data exchanges between them through a communication network. A protocol among the agents to reach the consensus is designed by cooperative control technique. Generally, time-delay is a challenge of control systems. Specifically, the time-delay problem is receiving more attention in the cooperative control of MASs because of the more probable time-delay in data transmission among the agents. Time-delay reduces the control effectiveness by deteriorating stability and the performance of the control protocol. These drawbacks demand careful time-delay consideration in cooperative control of MASs. In this paper, we carry out a survey on the methods for mitigating time-delay impacts in cooperative control of MASs by reviewing about 100 papers. Time-delay can result from natural/unintentional causes such as limited communication bandwidth, packet dropout, or overhead in communicating and from cyber-attack/intentional causes that flood the communication network. Moreover, we classify the methods based on the location of occurrence and the type of delay. In the end, our perspective on the future research direction is presented.</Abstract>
		<ObjectList>
			<Object Type="keyword">
			<Param Name="value">Consensus Control</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Control Protocol</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Graph</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Multi-Agent System (MAS)</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Time-Delay</Param>
			</Object>
		</ObjectList>
<ArchiveCopySource DocType="pdf">https://ijrtei.sbu.ac.ir/article_104708_fc562ee778347ab480f3b74146379ef8.pdf</ArchiveCopySource>
</Article>
</ArticleSet>
